My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0.-8.0. EDSR 11-15-1994
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1994
>
11-15-1994
>
6.0.-8.0. EDSR 11-15-1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/3/2016 11:39:59 AM
Creation date
3/3/2016 11:39:59 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
11/15/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> FIRST ACTION STEPS <br /> Two critical questions need to be answered before a process <br /> facilitation strategy is employed. <br /> 1> What exactly is the current situation? What are the <br /> strengths and where are the gaps in service? What are the <br /> perceptions and needs of the various stakeholders? <br /> 2> Why should anyone change the status quo? What are the <br /> costs and benefits of undertaking an examination of a City <br /> process? <br /> These questions are answered with an objective Needs <br /> Assessment conducted by a neutral third party. <br /> • <br /> Step 1: A Needs Assessment is conducted to <br /> ascertain the perceptions, experiences, and issues <br /> of City departments concerned with Reviewing and <br /> Permitting commercial and industrial projects. <br /> This information is gathered through confidential <br /> interviews with department managers and focus groups of 6-8 <br /> employees. <br /> Questions for the Needs Assessment can be generated by the <br /> consultants or with key City employees. Sample questions <br /> are found on page 6. <br /> • <br /> page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.