Laserfiche WebLink
8-uo <br /> 0 , <br /> City of Elk River-Riverfront Pathway along the Mississippi 20-Jul-95 <br /> Preliminary Cost Estimate <br /> Description Ulla Unit Cost Qty SubTti, <br /> Site Prep Demolition <br /> Walk removal SF $1.50 0 $0.00 <br /> Tree removal Cal.inch $16.00 225 $3,600.00 <br /> Bituminous removal SY $120 3050 $3,660.00 <br /> Utility Removal LS $7,500.00 1 $7,500.00 <br /> Erosion Control LF $2.00 1200 $2,400.00 <br /> Demolition Subtotal $17,160.00 <br /> Site Grading and Utilities <br /> Rough Grading CY $2.50 5500 $13,750.00 <br /> Final Grading SY $0.75 5500 $4,125.00 <br /> Storm Sewer-18'RCP,CL.V LF $21.00 425 $8,925.00 <br /> Catch Basins EA $800.00 8 $6,400.00 <br /> Relocate overhead lines LS $208,500.00 1 $208,500.00 <br /> 0 <br /> Subtotal $241,700.00 <br /> Site Paving <br /> Conc.Curb and Gutter LF $6.75 1170 $7,897.50 <br /> Broom Finish Conc.w/brick accents SF $4.25 4750 $20,187.50 <br /> Brick Pavers SF $9.00 4980 $44,820.00 <br /> Bituminous Trail SF $1.15 10900 $12,535.00 <br /> Asphalt Parking Lot SY $12.50 2050 $25,625.00 <br /> Rip-Rap SF $4.00 16000 $64,000.00 <br /> Adjustments at bridge LS $15,000.00 1 $15,000.00 <br /> Paving Sub-total $190,065.00 <br /> Site Lighting/Elec. <br /> Light Bases EA $350.00 28 $9,800.00 <br /> Ornamental Poles EA $2,950.00 28 $82,600.00 <br /> Lighting/Elec.Sub-total $92,400.00 <br /> III <br />