My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
EDSR MEMORANDUM 05-23-1996
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1996
>
05-23-1996 SPECIAL
>
EDSR MEMORANDUM 05-23-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 4:06:18 PM
Creation date
3/1/2016 4:06:17 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
5/23/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Creative Solutions for Land Planning and Design -- <br /> Hoisington Koegler Group Inc. 111[21 <br /> RIO <br /> April 17, 1996 <br /> Mr. Patrick Klaers, City Administrator <br /> City of Elk River <br /> P.O. Box 490 <br /> 13065 Orono Parkway <br /> Elk River,Minnesota 55330-1743 <br /> RE: Riverfront Pathway <br /> Dear Mr. Klaers: <br /> As we discussed at the last meeting of the Elk River HRA, we need to complete the schematic <br /> design and develop refined cost estimates in order for the City to determine the most appropriate <br /> way to proceed with the Riverfront Pathway project. That work is nearing completion, and a <br /> meeting with the HRA and Riverfront Pathway committee would be in order. <br /> Because of other events that may preclude my presence at a meeting in late April or early May, I <br /> would like to schedule such a meeting in the middle of May (May 15 or May 22). We can provide <br /> the BRA with information prior to that meeting if desired. <br /> • At the meeting,I would like to have the HRA and Riverfront Pathway committee review the entire <br /> design. The last time the project was presented to the HRA and the City Council, we learned a <br /> great deal, and the continued input of these groups will only benefit the project. We would also <br /> review the cost estimates, which would be broken into the following categories: <br /> Area 'A' The area along the river which falls between Jackson Street and King Street <br /> Area 'B' The "hole,"or the area directly across Jackson Street from Main Street to the river <br /> Area 'C' The area along the river east of Jackson Street <br /> Area 'B' would be divided into two parts to provide flexibility in identifying a project that could <br /> begin in 1996 or 1997. <br /> This information should allow the HRA to determine a course of action that suits the community's <br /> ability to implement an acceptable design. <br /> Please call me if you have any questions. <br /> Sincerely, <br /> HoisiAgton •egler Group Inc. <br /> • <br /> Michael Schroeder <br /> • <br /> 7300 Metro Boulevard.Suite 525,Minneapolis,Minnesota 55439 <br /> (612)835-9960 Fax(612)835-3160 <br />
The URL can be used to link to this page
Your browser does not support the video tag.