My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. EDSR 05-13-1996
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1996
>
05-13-1996 SPECIAL
>
3.0. EDSR 05-13-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 3:49:21 PM
Creation date
3/1/2016 3:49:19 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
5/13/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• reason the city has requested this purchase option is so that we can be <br /> assured that if things do not work out with TL Feeding and the existing <br /> Business Park owners, we will have a site available for this company. <br /> Additionally, another new possibility is the relocation of E & 0 Tool out of <br /> the Industrial Park to the Gagne property. At this time we understand that <br /> E & 0 Tool is looking to expand and that their preferred option is to construct <br /> new and relocate in the Business Park. <br /> One of the benefits for the city to move forward with this proposal if we can <br /> get a commitment out of E & 0 Tool, is that Mr. Gagne would then also deed <br /> the city a 48 acre parcel of property north of Highway 10, north of the Elk <br /> River that is mostly in the flood plain. As the EDA or City Council may <br /> recall, this property was once looked at as the Waco bridge area in our long <br /> range transportation plan. Regardless that the bridge is now proposed to be <br /> at Zebulon, this Waco property is very well suited for park development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.