My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.0. EDSR 04-08-1996
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1996
>
04-08-1996
>
8.0. EDSR 04-08-1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 3:29:08 PM
Creation date
3/1/2016 3:29:06 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
4/8/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sheet1 <br /> MARKETECH, INC. NEW BUILDING PROPOSAL <br /> • <br /> ITEMS SOURCES OF INCOME <br /> BUILDING BID $ 242,000.00 TIF $ 50,418.75 <br /> SAC CHARGES 2,600.00 CIMF 100,000.00 <br /> WAC CHARGES 2,000.00 FNB ER 185,706.25 <br /> PERMIT/PLAN/ST 2,795.00 <br /> MECHANICAL 200.00 TOTAL $ 336,125.00 <br /> ELECTRIC 300.00 <br /> GAS 30.00 <br /> PLUMBING 100.00 <br /> TIF FEE 5,000.00 <br /> MOVING COSTS * 5,000.00 <br /> LANDSCAPE * 5,000.00 <br /> MACHINE HOOK UP * 2,000.00 <br /> UTILITIES: * 100.00 <br /> WATER * 100.00 ALLOWANCES included in building cost <br /> SEWER * 100.00 <br /> POWER COMPANY * 100.00 SHOP FLOOR $ 5,000.00 <br /> NATURAL GAS * 100.00 OFFICE FLOOR $ 3,000.00 <br /> CABINATES 1,500.00 EXCAVATING $ 8,000.00 <br /> RACKS ETC. 2,000.00 BLACK TOPPING $ 20,000.00 <br /> TOTAL BLDG COSTS* <br /> OSTS $ 271,025.00 *ESTIMATED COSTS <br /> II LAND COST $ 65,100.00 <br /> , l <br /> TOTAL PROJECT $ 336,125.00 <br /> • <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.