Laserfiche WebLink
Sheet1 <br /> MARKETECH, INC. NEW BUILDING PROPOSAL <br /> • <br /> ITEMS SOURCES OF INCOME <br /> BUILDING BID $ 242,000.00 TIF $ 50,418.75 <br /> SAC CHARGES 2,600.00 CIMF 100,000.00 <br /> WAC CHARGES 2,000.00 FNB ER 185,706.25 <br /> PERMIT/PLAN/ST 2,795.00 <br /> MECHANICAL 200.00 TOTAL $ 336,125.00 <br /> ELECTRIC 300.00 <br /> GAS 30.00 <br /> PLUMBING 100.00 <br /> TIF FEE 5,000.00 <br /> MOVING COSTS * 5,000.00 <br /> LANDSCAPE * 5,000.00 <br /> MACHINE HOOK UP * 2,000.00 <br /> UTILITIES: * 100.00 <br /> WATER * 100.00 ALLOWANCES included in building cost <br /> SEWER * 100.00 <br /> POWER COMPANY * 100.00 SHOP FLOOR $ 5,000.00 <br /> NATURAL GAS * 100.00 OFFICE FLOOR $ 3,000.00 <br /> CABINATES 1,500.00 EXCAVATING $ 8,000.00 <br /> RACKS ETC. 2,000.00 BLACK TOPPING $ 20,000.00 <br /> TOTAL BLDG COSTS* <br /> OSTS $ 271,025.00 *ESTIMATED COSTS <br /> II LAND COST $ 65,100.00 <br /> , l <br /> TOTAL PROJECT $ 336,125.00 <br /> • <br /> Page 1 <br />