Laserfiche WebLink
• CONCLUSION <br /> The estimated total cost of the proposed 171st Avenue street and <br /> drainage improvements are $256,200. The project is feasible from an <br /> engineering standpoint and meets all standards set forth by the City. Some <br /> determination may have to be made as to whether or not the proposed <br /> improvements will increase the value of the property to be assessed in an <br /> amount equal to or greater than the assessment. <br /> • <br /> • <br /> 7 <br />