My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. EDSR 09-08-1997
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1997
>
09-08-1997
>
7.0. EDSR 09-08-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2016 9:02:54 AM
Creation date
3/1/2016 9:02:52 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
9/8/1997
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Strategic Plan Memo <br /> December 31, 1996 <br /> Page 3 <br /> made available for viewingat the meeting.) This mapalso <br /> g <br /> identifies eight specific areas within the USB which may be <br /> zoned appropriately to allow industrial development. These <br /> areas are identified in orange on the enclosed zoning map. <br /> The proposed transportation corridor connecting County <br /> Roads 13, 12, and Highway 10, is integral to creating <br /> industrial opportunities in areas 3, 5, 6, and 7. <br /> In total,the eight areas identified as potential industrial <br /> opportunities equal approximately 440 acres. Obviously, all <br /> these areas are not immediately available for development. <br /> However, areas 1, 2, and 4 could be made available as soon as <br /> rezoning would occur. Those areas which are dependent upon <br /> the transportation corridor being constructed may not be <br /> available with utilities until the next one to five years. Two <br /> major factors affecting construction of the transportation <br /> corridor include the timing of the housing development on the <br /> Waddy Schultz property, and also the commercial <br /> development of the Earl Hohlen property. If these two <br /> projects were to begin within the next year, it feasible the <br /> transportation corridor could be constructed up to <br /> approximately %2 mile south of County Road 12, allowing <br /> areas 5 and 6 to be available for development. <br /> • What is the recommended phasing approach? <br /> Planning and Economic Development staff have discussed a <br /> phasing concept which includes the following: <br /> - Phase I (0-5 years) - current west business park <br /> property including Areas 1, 2, & 4 and industrially <br /> zoned areas outside the USB at intersection of <br /> Highway 10 and Edison Street <br /> - Phase II (3-7 years) - Areas 3, 5, & 6 <br /> - Phase III (7-10 years) -Areas 7 & 8 <br /> - Phase IV (15-25 years)- industrially zoned gravel <br /> mining area <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.