My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0. EDSR 03-09-1998
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1998
>
03-09-1998
>
6.0. EDSR 03-09-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/29/2016 2:33:53 PM
Creation date
2/29/2016 2:33:53 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
3/9/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` t <br /> 3. Purpose of Loan: <br /> The purpose of this request for a micro loan is based on the following: <br /> SThe applicant is proposing the construction of a 25.0(10 square fent light <br /> industrial building to be located on Highway 10 East of Elk River near the <br /> city limit. The Subject site now owned by the Applicant does rot have access <br /> to city sewer and water or a storm drainage system. In order to comply with <br /> . _ . . • • - • _ ill <br /> need to include a complete fire sprinkler system. Because the site does not <br /> - _ r <br /> storage tanks and an adequate well pursuant to Minnesota Building Codes in <br /> order to accomplish as approvea approvefire sprinkler system. The total cost <br /> involved for the said fire sprinkler system is estimated to be approximately , <br /> $ 58,000. to $ 64,009. Therefore, the applica..L is 11er.Ly reajuebLiLL6 a micro <br /> loan in the amount of $ 50,000. or more with an annual interest rate of not <br /> mole than seven pc-LI-cal and a LepaymeuL sdliedule based un twenty years. <br /> 4 . Cost of Project: <br /> A) Land $ 140,000 <br /> B) Buildings (attach plans & costs) $ 750,000 <br /> C) Equipment/Machinery/Fixtures (attach list <br /> • and estimated costs) $ -0- <br /> IIP <br /> D) Site Development $ 225,000 <br /> E) Industrial Inventory/Working Capital $ 0- <br /> F) Other (attach description) Engineering, legal $ 107,000 <br /> & contingencies <br /> TOTAL COSTS $ 1,222,000 <br /> - 5. Proposed Financing: <br /> SOURCE NAME TERMS AMOUNT <br /> A) Bank Loan The Bank or Firstar (20 years) $ 862,000 <br /> B) TIF Funds City of Elk River $ -160,000 (land) <br /> C) Other Private Funds $ -0- <br /> D) Applicant Contribution $. 150 nnn <br /> E) Other $ -0- <br /> F) Fed Grant/Loan $ -0- <br /> G) State Grant/Loan $ -O- <br /> H) This Loan Micro Loan-City of Elk River $ 50,000 <br /> • TOTAL FINANCING $1,222,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.