My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3.0. EDSR 03-08-1999
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
1993-2002
>
1999
>
03-08-1999 SPECIAL
>
3.0. EDSR 03-08-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 11:17:22 AM
Creation date
2/23/2016 11:02:48 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
3/8/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• East Highway 10 Development/Redevelopment <br /> Priority#3 -Redevelop the East Highway 10 Corridor <br /> Action Ste. Complete In Process Ongoing Future <br /> Establish the criteria for identification of x <br /> redevelopment areas within and outside <br /> the Urban Service Boundary along east <br /> Highway 10 <br /> Identify and prioritize these east x <br /> Highway 10 redevelopment areas <br /> Establish a plan to redevelop and market x <br /> each of these prioritized areas <br /> coordinating efforts with the proposed <br /> transportation corridor connecting <br /> County Roads 12/13 and Highway 10 <br /> Inventory property owners within these x <br /> redevelopment areas and discuss <br /> possible"Joint Development <br /> Agreements", and other cooperative <br /> efforts which could be undertaken to aid <br /> in development of these areas <br /> Establish a long term design and land x <br /> use plan which might include <br /> establishing a uniform design theme for <br /> • the overall area utilizing some of the <br /> elements of the central business district <br /> Focus Study (when completed) <br /> 4110 <br /> 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.