My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 PCSR 02-23-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
02-23-2016
>
6.3 PCSR 02-23-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 12:11:49 PM
Creation date
2/19/2016 11:40:11 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/23/2016
case
CU 16-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the bank property to provide overflow parking;however this limits future development opportunities on <br /> that property. <br /> Parking Needs <br /> Commercial Residential Required Available Deficiency <br /> Ord. @ 2.5/du 45 230 275 215 -60 <br /> Res. @ 2.34/du 45 215 260 215 -45 <br /> Res. @ 2.25/du 45 207 252 215 -37 <br /> Res. @ 2.0/du 45 184 229 215 -14 <br /> Parking has been, and continues to be,a significant concern. When Coachman Ridge and the Depot <br /> received approval for parking reductions, their uses did not include commercial or restaurant uses which <br /> add a different component when considering a reduction of the requirements.They are also located in <br /> close proximity to the train station,providing convenient access to that form of transportation. Finally, <br /> locating a parking lot below the bluff area, as discussed last meeting,would require paving the current <br /> access road and including curb and gutter. Due to additional regulations imposed by the DNR in the wild <br /> and scenic river district, this may be difficult. <br /> Stormwater <br /> City ordinance requires that new developments treat all runoff to a degree that existing runoff rates and <br /> volumes are not exceeded.The applicant is utilizing a number of best practices like green roofs and <br /> permeable pavements to treat and reduce runoff on site,but additional control structures are required. <br /> The applicant is proposing to expand the city's stormwater pond north of the site to treat runoff <br /> generated by the development. The pond currently treats runoff from the city streets between Yale Ct <br /> and the north end of the townhome development. Additionally, the feasibility study for the extension of <br /> Yale Court and construction of the frontage road along Highway 10,identifies a need to expand the pond <br /> for treatment of runoff generated by the new city street. <br /> On January 20, 2016, the applicant submitted a narrative describing two alternative treatment locations <br /> for runoff from the new city street. The alternatives have been reviewed with the City Engineer and the <br /> city does not support the proposed alternatives. His comments are included as an attachment. The city <br /> currently owns the locations where additional ponding is proposed and,with the expenses already <br /> associated with the project, cannot support increasing the costs for additional property needed for <br /> alternative ponding sites. The applicant addressed these concerns in the attached narrative January 20, <br /> 2016. <br /> Standards for Approval <br /> City ordinance section 30-1564 outlines the requirements for approval of a PUD. <br /> 1. Land will be :zoned into the PUD e oning district only upon approval of a concept plan for the PUD,pursuant to <br /> the procedure set forth in this section. . PUD will be authoritied on land in a PUD :zoning district only upon <br /> issuance of a conditional use permit,pursuant to the procedure set forth in this section. <br /> Re-zoning is not required. The property is already zoned PUD as it was included in a previous <br /> project. The concept plans submitted by the applicant should be used to review the new project. <br /> \\dc3-elkr\shared\Departments\Community Development\Planning\Case Files\CUP\CU 16-02 Modem Construction\CU 16-02 SR PC Modem <br /> Construction 2-23-2016.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.