My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3 PCSR 02-23-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
02-23-2016
>
6.3 PCSR 02-23-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 12:11:49 PM
Creation date
2/19/2016 11:40:11 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/23/2016
case
CU 16-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Carlton, Zachary <br /> From: Jesse Hartung <jesse @modemconstructiommn.com> <br /> Sent Wednesday,January 20,2016 2:42 PM <br /> To: Carlton,Zachary <br /> Subject: response to comments <br /> Attachments: Ecology Project Response to comments 01202015.docx;Ecology concept set <br /> 01202015.pdf;Ecology Project Response to comments 01202015.docx;Stormwater <br /> Narrative.pdf <br /> Follow Up Flag: Follow up <br /> Flag Status: Flagged <br /> Categories: Red Category <br /> Zach, <br /> Attached is my response letter and the updated site plan,updated building concept sketch,and written opinion from a <br /> stormwater engineering firm. The landscape plan is coming to me today but likely not for a few hours so I wanted to get <br /> this stuff in your hands now. I strongly believe the project not only meets but greatly exceeds the expectations for all <br /> departments. I know the stormwater pond expansion needs to be relocated but I think this project along with the land <br /> the city will aquire along the river greatly over weight the need to expand the stromwater pond at that location. I hope <br /> to gain the support from the planning commission to have the stromwater pond relocated and am willing to provide any <br /> assistance I can in that matter. <br /> Let me know if you have any questions or concerns. Thanks. <br /> Jesse G. Hartung <br /> President <br /> Direct:952.217.1627 <br /> Email: iesse @modernconstructiommn.com <br /> Modern Construction of Minnesota, Inc. <br /> Office: 763.200.6376 I Fax: 866.259.8354 <br /> 621 Main ST <br /> Elk River, MN 55330 • <br /> www.modernconstructionmn.com <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.