Laserfiche WebLink
City of �j <br /> ElkMemorandum <br /> River <br /> To: Planning Department <br /> From: Brandon Wisner, Stormwater Coordinator <br /> Date: February 3,2016 <br /> Subject: Site Plan Review Meeting—February 1, 2016 <br /> The department listed above has reviewed the application(s) listed below and has the following <br /> comments: <br /> Case # CU 16-04—Cornerstone Auto Elk River <br /> 1. NPDES permit is needed for construction activity disturbing more than one acre. Proof of <br /> the SWPPP designer's `Design of Construction SWPPP' certification. <br /> 2. Updated `Operation and Maintenance' document for all associated permanent stormwater <br /> best management practices and an updated SWPPP sheet with all required notes. <br /> 3. In the approved plans from 2006,less stormwater was proposed to be sent to the larger <br /> basin east of the main Cornerstone building. The basin to the east is shown to be on a <br /> different property, owned by a different party. Provide necessary documentation that further <br /> stormwater directed to the east basin is approved by the appropriate property owner. <br />