My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 PCSR 02-23-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
02-23-2016
>
6.1 PCSR 02-23-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 11:33:45 AM
Creation date
2/19/2016 11:32:36 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
2/23/2016
case
CU 16-04
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site <br /> Landscaping,Drainage and Lighting <br /> We have submitted a landscape plan, drainage plan and lighting plan. Our green <br /> space/tree requirements were met when our lot was redone in 2006. <br /> Our lot lighting was approved and installed in 2006. As part of this current proposal, one <br /> light pole will be eliminated to accommodate the entrance to the Oil Express. Wall <br /> lighting will be sued to replace this light. Four new poles will be added for the new <br /> parking area on the north side of our building adjacent to the office and parts/service <br /> additions. The only other exterior lighting that is changing will be the removal and <br /> addition of lights on our building. None of our perimeter lighting is changing. Our <br /> building is in the center of a fairly large parcel, so consequently none of the lighting <br /> changes will have any effect on neighboring properties. <br /> Our drainage,that featured bio-retention ponds was also approved and built in 2006. Our <br /> proposed building foot print is now smaller and there is less impervious area. <br /> Parking and Drives <br /> As noted above,the Oil Express/service lane expansion proposed will aid the traffic flow <br /> of our site. Currently service, sales and Oil Express traffic mingle in a confusing mess of <br /> conflicting turn movements. The most commonly use entrance to our site is off of 17151 <br /> Avenue. As you enter our site from that direction, our proposed layout immediately <br /> separates Oil Express and service traffic from sales traffic. The Oil Express and service <br /> traffic is then further separated from each other with plenty of stacking for customers <br /> waiting in line. <br /> Fire Protection <br /> Fire Hydrants for an expansion were approved and installed in 2006. Also at that time <br /> the water lines on our site were looped to ensure appropriate pressure to those hydrants. <br /> The Fire Marshall will need to approve the new fire sprinkler riser, location of fire <br /> department connection, lock box,etc., but site infrastructure regarding fire is in place. <br /> New Signage <br /> Free Standing Signage <br /> None <br /> Wall Signage <br /> North Elevation <br /> New-"CORNERSTONE" over Chrysler's arch- 70 square feet <br /> New - Cornerstone Logo on separation tower—80 square feet <br /> West Elevation <br /> New-Four Chrysler Wall Badges - 60 square feet(9 Series, see attachment) <br /> New- Ford Oval—45 square feet(see attachment) <br /> Existing—25 square foot "SERVICE"sign <br />
The URL can be used to link to this page
Your browser does not support the video tag.