Laserfiche WebLink
D&C RIPPLINGER &2dee, LL / ,fl <br /> TAX INCREMENT FINANCING PROPOSAL REVIEW WORKSHEET <br /> • 1. The project meets the criteria set forth in Section III of the City's <br /> Tq.x Increment Financing policy. <br /> a) Meets minimum thresholds for size, value, and tax capacity. <br /> LZ b) Meets at least one of the objectives in Section III and satisfies <br /> the provision set forth in Section IV. <br /> t� c) Demonstrates need for TIF with the but-for analysis. <br /> l/e) Consistent with all city plans and ordinances. <br /> f) Serves at least two public purpose as defined in Section IV. <br /> 2. Ratio of Private to Public Investment in Project: Points: 7 <br /> $ 70 ,6. Private investment \� 5:1 5 <br /> $/73, 3'O Public Investment( s Sa&/v,v -��' 4:1 <br /> .3/4-I Ratio Private : Public Financing 3:1 3 <br /> 2:1 2 <br /> Less than 2:1 1 <br /> 3. Job Creation in the City of Elk River: Points: <br /> '5 Number of new jobs as a result of the project. 40+ 5 <br /> Number of existing/retained jobs divided by 10. 30+ 4 <br /> q 5 Total 20+ 3 <br /> 10+ 2 <br /> • Less than 10 <br /> 4. Ratio of TIF to new jobs created: Points: 7 <br /> $/73, yr s', TIF request $15,000 or less 5 <br /> �1. 5 Number of new jobs created $20,000 or less 4 <br /> $ /3",.2 2- of TIF per new job created $22,000 or less 3 <br /> $25,000 or less 2 <br /> Over $25,000 1 <br /> 5. Wage Level of jobs created: Points: - <br /> Average hourly wag Over $21/ hour 5 <br /> of jobs created: 7 /S..©c $18-21 /hour 4 <br /> $14-17 /hour <br /> $10-13 /hour 2 <br /> Under $10 /hour 1 <br /> 6. Project size: Points: 2 <br /> .4 <br /> The project will result in the construction 80,000+ 5 <br /> of square feet /6, 2c2CD y2e__ 65,000+ 4 <br /> 50,000+ 3 <br /> 3 -<:DO 4J '). 4)-e:fj35,000+ <br /> • �` „r, ® eT 25,000+ 1 <br /> 12 <br />