Laserfiche WebLink
Update Page 2 of 2 <br /> long enough to work through the larger funding issues. The alternative for <br /> • us is to simply shut down our office completely on April 15th. <br /> There is no need for me to attend the EDA meeting unless the City wants me <br /> to. At this time, I would ask you to present our proposal to the EDA and let <br /> me know their decision. If the EDA wants us to shut down, let me know on <br /> the 9th and I will begin the process. <br /> Thanks again for all the help. I certainly appreciate the efforts of Elk River to <br /> aide in the development of new energy technologies. That much I will carry <br /> with me for the rest of my life. <br /> Regards, <br /> Ed <br /> Edward G. Palmer, CEO <br /> SolarAttic, Inc. <br /> 15548 95th Circle NE <br /> Elk River, MN 55330 <br /> (763) 441-3440 <br /> • (763) 441-7174 fax <br /> http://www.solarattic.com <br /> Solar Without Panels! <br /> "OWN A PIECE OF THE GLOBAL WARMING SOLUTION!" <br /> • <br /> 4/3/02 <br />