My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0. EDSR 12-08-2003
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2003
>
12-08-2003
>
6.0. EDSR 12-08-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 4:17:29 PM
Creation date
2/10/2016 4:17:28 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
12/8/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Priority /13 <br /> East Hwy. 10 <br /> Development/Redevelopment <br /> ..,,..uai,.. ., rs,;, .:;:. �,;-.... .....v�r'rwt 'w',�`'�tta� k:,.. _ ..,.�.,. .a_.. <br /> Cs) Redevelop the East Highway 10 Corridor <br /> ✓ Establish the criteria for identification of redevelopment areas within <br /> and outside the Urban Service Boundary along east Highway 10 <br /> ✓ Identify and prioritize these east Highway 10 redevelopment areas <br /> ✓ Establish a plan to redevelop and market each of these prioritized <br /> areas coordinating efforts with the proposed transportation corridor <br /> connecting County Roads 12/13 and Highway 10 <br /> ✓ Inventory property owners within these redevelopment areas and <br /> • discuss possible "Joint Development Agreements", and other <br /> cooperative efforts which could be undertaken to aid in <br /> development of these areas <br /> ✓ Establish a long term design and land use plan which might include <br /> establishing a uniform design theme for the overall area utilizing <br /> some of the elements of the central business district Focus Study <br /> (when completed) <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.