My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 09-20-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
09/20/2004
>
6.2. SR 09-20-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:58 AM
Creation date
10/15/2004 2:23:21 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/20/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(15) Debris <br /> <br />The piling, storing, or keeping of old machinery, junk, debris, or abandoned <br />motor vehicles, shall be prohibited on this site, with the exception that <br />reusable parts may be stored on the mineral excavation site provided that it is <br />in a location that cannot be viewed from adjacent properties or is totally <br />screened. <br /> <br />(16) Vibration <br /> <br />Mining activities shall not cause excessive vibration off site. If excessive <br />vibration becomes an issue, the City reserves the right to take appropriate <br />measures to alleviate the problem. <br /> <br />(17) Groundwater Protection Measures <br /> <br />a. The Operator shall file with the City an Environmental Spill Plan and <br />a Storm Water Pollution Prevention Plan. The Operator shall adhere <br />to these plans in the event there is a spill. <br /> <br />b. The Operator shall provide the Fire Department with a copy of their <br />flammable or hazardous materials. <br /> <br />c. Refueling shall take place only at designated locations. <br /> <br />d. All incidences that have the potential to adversely affect groundwater, <br />including but not limited to spills, shall be verbally reported to the <br />City within 24 hours. This verbal notification shall be followed up in <br />writing within four (4) working days. <br /> <br />e. The appropriate storm water permits (NPDES) shall be obtained by <br />the Operator from MPCA and copied to the City. <br /> <br />f. Prior to commencing mining, the monitoring well located at the site <br />shall be monitored for diesel range organics (DRO), pH, temperature <br />and conductivity to establish baseline data. The reference parameters <br />shall be monitored a minimum of once each mining season <br />thereafter. In the event of a spill, the City may require additional <br />testing events, parameters and monitoring wells, as well as the <br />cessation of operations until the spill is deemed clean by the City. <br /> <br />g. Gravel washing operations and dewatering are prohibited at this site <br />and will require an amendment to this permit to be allowed in the <br />future. <br />
The URL can be used to link to this page
Your browser does not support the video tag.