My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. SR 09-20-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
09/20/2004
>
6.2. SR 09-20-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:58 AM
Creation date
10/15/2004 2:23:21 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/20/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />b. Each year a plan for that year's reclamation shall be approved by the <br />Building and Environmental Administrator prior to issuance of the <br />mineral excavation license. <br /> <br />c. Upland reclamation shall include topsoil from the site being <br />preserved and put back into place after mining and seeded as per the <br />approved plans. The vegetation established for the reclamation must <br />be maintained until it is self-sufficient. <br /> <br />d. Wetland restoration shall be in compliance with the approved <br />wetland mitigation plan. The Operator shall provide a letter of credit <br />in favor of the City for wetland restoration in the amount of $13,750. <br />Said letter of credit shall be in place prior to commencing Phase 4 of <br />the Operation. A formal wetland monitoring plan shall be submitted <br />for City approval one year after wetland restoration has been <br />completed on the Property and the J & B Mining site. The wetland <br />letter of credit may be released upon approval of the ftrst year <br />monitoring report, but monitoring shall continue for an additional 2 <br />to 4 years after, as determined by city staff. <br /> <br />e. Contours, finished grades, details of erosion control methods, and <br />settling ponds, shall comply with the plans submitted and the City <br />ordinance at the time of reclamation. Additional measure as <br />determined by city staff may be required. <br /> <br />(10) Traffic <br /> <br />a. Material mined as part of this Operation shall be hauled directly to <br />the Elk River Bituminous site via easements, not accessing any public <br />road. Other access from the site to Highway 169 at 219'h Avenue will <br />be eliminated when frontage roads leading to interchanges are <br />developed. <br /> <br />b. All portions of drives shared by this Operation and another business <br />or residence shall be a minimum of twenty feet wide and hard <br />surfaced. The Operator shall provide the City with executed copies <br />of all agreements concerning the ability to make improvements to <br />these drives and their maintenance prior to the Operation <br />commencmg. <br /> <br />c. Tbe sale of product from the Operation shall only take place from <br />the Elk River Bituminous site and then only after receiving <br />authorization from the Minnesota Department of Transportation and <br />completing all required improvements to the access for that site prior <br />to commencing said sales. <br />
The URL can be used to link to this page
Your browser does not support the video tag.