My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.e. ERMUSR 02-09-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
02-09-2016
>
6.1.e. ERMUSR 02-09-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 2:41:09 PM
Creation date
2/9/2016 2:41:08 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk- Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> February 9, 2016 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered three new residential water meters, and two new commercial meters. <br /> • Sealed the water meter, and took curb stop ties from one water service. <br /> • Went on six service calls. <br /> • Completed three water turn-ons and one electric turn-on. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards. <br /> • The water operators have completed all of the annual services for the filters. Now they <br /> will be working on the total reconditioning of Well#3. This will include repairing or <br /> replacing any items that need attention. Part of this project includes the well being pulled <br /> and reconditioned. We will also be having a painter come in to sandblast and paint the <br /> filter and all of the piping. <br /> • We interviewed for the vacant water operator position on February 1St and 3rd. We hope <br /> to have the position filled by March 1St <br /> ATTACHMENTS: <br /> • January Pumping by Well <br /> • January 2016 Accumulated Precipitation Graph <br /> • January 2016 Daily Temperature Graph <br /> EN <br /> POWERED BY <br /> Page 1 of 1 NATURE <br /> Reliable Public <br /> Power Provider POWERED T o S E 0.V E <br /> 134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.