My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. ERMUSR 02-09-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
02-09-2016
>
5.2. ERMUSR 02-09-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 2:34:47 PM
Creation date
2/9/2016 2:19:40 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Outage Cause Count View <br /> ElectiicalFalure 7_ @P <br /> 'WMteAccident 4 +l� <br /> Equipment Worn Out 4 0 <br /> 17. ',*A; �� � i gip. s' o$ <br /> u g 2 VP <br /> Other 2 0 <br /> Many investor owned and cooperative run utilities"storm normalize"their reliability numbers <br /> by removing"major outages"due to storms from their reliability index number calculations. <br /> Our reliability numbers have not been storm normalized. Our numbers reflect these major <br /> outages and represent what our customer actually experienced in 2015. Overall, our electric <br /> distribution system is robust and our reliability is very high. <br /> ACTION REQUESTED: <br /> No action is required. <br /> ATTACHMENT: <br /> American Public Power Association's eReliability Tracker 2015 Annual Report <br /> PyBNEAEB B1 <br /> ® NATURE <br /> Page 4 of 4 <br /> Reliable Public <br /> Power Provider P 0WE 0.E D T O S ERV E <br /> 104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.