Laserfiche WebLink
► Notes/History Catherine Mehelict, City of Elk River <br /> 13065 Orono Parkway <br /> Elk Rive, MN 55330 <br /> 1110 <br /> Contact : <br /> Note 5/3/2004 Per phone msg company is evaluating site information from communities. Has 1.5 yrs left on <br /> lease. Will keep Elk River in mind. Schedule follow up contact in 1 year. <br /> Note 4/5/2004 Wants to relocate company to Rogers-Elk River area. Designs,builds and installs <br /> pre-fabricated robotic systems. Leasing 41,000sf including 6500sf office. Downsize to same <br /> office sf+20,000sf production. Has 1.5 years left on lease. 13 jobs,was at 35 jobs. Follow <br /> up regarding MTI program,micro loan and the old Roma Tool building. <br /> Contact : <br /> Note 2/20/2004 Interested in moving business to Elk River. Looking for space to lease. Referred to Lynn <br /> Caswell for Elk Path Business Center spec building. <br /> Contact : <br /> Note 4/23/2004 Inquired about M&A building,faxed her information on the building <br /> .................... <br /> Contact : <br /> Note 3/19/2004 looking for a restaurant site in Elk River or Otsego,referred him to Chamber <br /> Contact : <br /> Note 3/24/2004 considering Elk River location,requested statistics,provided him info.from the Community <br /> • Profile <br /> ......................... <br /> Contact : <br /> Note 4/21/2004 Ann Breur inquiring about city-owned Joplin&Business Center Drive lot,available? <br /> Responded that the city has a proposal out for the site and it was not available at the time. <br /> Note 1/6/2004 Inquiry about city-owned lot at Joplin&Business Center Drive,for new office construction. <br /> Lot reserved for Light Industrial proposal-Orluck. Referred to Chamber for office sites. <br /> Contact : <br /> Note 2/13/2004 Lead from Money Breakfast-company located in Albertville interested in expanding. Urgent <br /> need for space. Left voice message. <br /> Contact : <br /> Note 1/9/2004 Called Jim Gromberg,Connexus for follow up. Trisha is working with Sportech on causes and <br /> options. Problem could be custom-built machines. <br /> Note 1/7/2004 Concern about amount of first electric(Connexus)bill on new expansion-too high. Has hired <br /> outside consultant to research but could be real problem for Elk River industries. Working with <br /> Connexus to evaluate situation. <br /> Contact : <br /> Note 8/24/2004 Decision to build instead. Left msg to follow up. <br /> Note 7/21/2004 2,500-4,500 light industrial lease space <br /> needed,provided him industrial lease space info. <br /> o e 7/20/2004 Elk River resident, Needs 4000sf(incl. 1200sf office)manufacturing space in Elk River to lease <br /> for design,fabrication of food processing equipment. Needs within 3-4 months. Referred to <br /> Heidi for follow up. <br /> Created 9/7/2004 at 7:20 PM 8 <br />