My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. EDSR 08-09-2004
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2004
>
08-09-2004
>
5.1. EDSR 08-09-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/4/2016 3:07:51 PM
Creation date
2/4/2016 3:07:51 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
8/9/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gradient Technology&Orluck Industries Project Update <br /> August 9,2004 <br /> Page 2 of 2 <br /> • Orluck Industries, Inc. will occupy half of the 20,000-square foot facility for its precision <br /> machining operation. The balance of the space will be leased to other eligible business park <br /> uses. The Orluck Industries currently employs 13 full-time and 3 part-time staff at wages <br /> between $15-22.00 per hour at its Dayton,Minnesota facility. <br /> Project Status <br /> Mark Orluck, the President of Orluck Industries has recently met with staff to review a <br /> preliminary site plan. The site plan includes room for up to a 15,500-square foot future <br /> expansion to the initial building. The exterior of the building will be constructed with rock- <br /> faced concrete block and glass materials. Staff anticipates that construction will commence <br /> in September, for occupancy by early next year. <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.