My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.9. SR 10-18-2004
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2004
>
10/18/2004
>
5.9. SR 10-18-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:33:57 AM
Creation date
10/15/2004 10:34:24 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/18/2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />the intersection. Three of the offstreet parking spaces affected are on private property <br />and these would be impacted by relocating the interior circulation patterns. <br />5. Utility impacts include installation of a new catch basin, relocation of a light pole and <br />adjustment of a manhole cover. It is not know at this time what underground utility <br />relocations may be needed. <br />6. The sidewalk in the area of the turn lane would be removed and relocated along the curb <br />line. The construction of the new walk would most likely be pavers to match the existing <br />Mainstreet walks. <br />7. Signage and pavement marking to show the new turn lane would be needed <br />8. The street section is not know at this time, it was assumed to be 2 inches of bituminous <br />wear, 5 inches of bituminous base and 10 inches of class 5 aggregate base <br />9. The surface of the pork chop island was assumed to be finished in concrete to match the <br />existing island in the center of Mainstreet. <br />10. it appears no right of way needs to be acquired for the construction of this turn lane. <br /> <br />Estimated Project Costs <br /> <br />An estimate of construction costs was prepared and is attached to this memo. The following is <br />a breakdown of the estimated project costs: <br /> <br /> Jackson Avenue Parish Avenue Total <br />Construction Cost $ 5,000 $61,000 $66,000 <br />Contingency (10%) $ 500 $ 6,100 $ 6,600 <br />Overhead (25%) $ 1,250 $15,250 $16,500 <br />Total $ 6,750 $82,350 $89,100 <br /> <br />0:\PROJ\813320J\0325\mem060104 Jackson and Parish Right tum lanes. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.