Laserfiche WebLink
<br />Bluff Block <br />September 22, 2004 <br /> <br />Page 2 <br /> <br />4. Sanitary sewer and water facilities are available for the redevelopment in this plat from <br />Main Street. Therefore, the existing sanitary sewer services which flow southerly to the <br />river bank sewer line will need to be properly abandoned. <br /> <br />5. There are existing small utility lines along the west edge of the preliminary plat which run <br />from Main Street to the existing facilities along the south line in Outlot A. A <br />determination will need to be made before the fmal plat whether or not these small <br />utilities can stay in place. If they will remain in place, the appropriate easements will <br />need to be provided on the final plat. If they are not to stay in place, documentation that <br />there is somewhere for them to be relocated and an agreement from the utilities to re- <br />locate their facilities should be a condition of the final plat. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br />~ <br />T::f::~ <br /> <br />City Engineer <br /> <br />S,\PLANNlNG\Case File,\2004\P 04.20 Bluff Block\Engineer', memo 9.22-04.doc <br />