My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3. EDSR 07-11-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2005
>
07-11-2005
>
5.3. EDSR 07-11-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2016 9:14:51 AM
Creation date
2/3/2016 9:14:46 AM
Metadata
Fields
Template:
City Government
type
EDSR
date
7/11/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Business Center <br /> July 11,2005 Page 2 <br /> As can be observed on the aerial photo, there are some parcels that already have uses on <br /> • them. They include: Morrell Trucking,the John Weicht multi-tenant building at Ulysses and <br /> 171St Avenue,Ebner's Bait, a single family home along Highway 10,NRG's Refuse Derived <br /> Fuel Plant, Hetland's Recycling Center, and the former Aqua Pure facility. In addition to the <br /> existing uses, there are a number of wetland areas as illustrated on the two concept plans. <br /> Concept Development <br /> Concept development was constrained by the following factors: <br /> • At 171st Avenue, the road must align with Ulysses Street <br /> • Beyond the City Property,the road must follow the alignment established by the <br /> agreement with Cargill <br /> • Wetlands must be avoided except for needed road crossings <br /> • Road crossings of the Northern Natural Gas easement must occur as close to 90 <br /> degrees as possible <br /> • Between Highway 10 and Ulysses Street,no full intersections will be allowed <br /> As a result of the above constraints, only two concepts were developed. The significant <br /> difference between Concept Option A and Concept Option B is the addition of a cul-de-sac <br /> in the northwest corner of the site, and the lot configuration in the westerly loop. Option A <br /> shows a large regional pond constructed between two wetland complexes,whereas Option B <br /> indicates lots being created. Option A also indicates smaller lot sizes versus Option B's <br /> • significantly larger lots. <br /> Discussion Points <br /> Staff is seeking direction from the EDA and City Council on the following issues: <br /> 1. The types of uses envisioned for both the commercial and industrial portions of the area. <br /> Light Industrial zoning allows for outdoor storage;is the City interested in small <br /> buildings with significant outdoor storage, or would the vision of the City be better <br /> served by rezoning this area to Business Park? Large commercial development will be <br /> hampered by the presence of wetlands in this area. <br /> 2. The balance between Highway Commercial and Light Industrial property. <br /> 3. Does the City want to become a commercial developer, or is it preferable to sell the <br /> commercial portion and use those funds to fund the infrastructure improvements? <br /> 4. The preference in lot size creation. <br /> Staff's next action will be to invite the adjacent property owners in for a discussion of the <br /> two concepts and request their input on suggested changes for development. It is <br /> anticipated that this meeting will occur in August,with information from that meeting <br /> brought back to the City Council in September. <br /> • <br /> S:\PLANNING\Case Files\2005\Gateway Business Center\07 11 05 cc memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.