My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0. EDSR 02-14-2005
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2003-2013
>
2005
>
02-14-2005
>
6.0. EDSR 02-14-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 3:27:54 PM
Creation date
2/2/2016 3:27:51 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
2/14/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Industrial Land Development Update <br /> February 14,2005 EDA Meeting <br /> Page 2 of 2 <br /> • Request for Proposals <br /> Ehlers &Associates have recommended that the EDA utilize an RFP process that insures <br /> that the EDA would receive the highest price for the property, development to the highest <br /> and best uses and allow the EDA to control the process. The RFP process is a way to <br /> market the site immediately to developers and brokers and get their input on concept design <br /> prior to improvements. <br /> RFP materials were prepared and mailed to 20 developers and brokers earlier this month. <br /> The deadline for proposal submissions is March 1. Staff has received a couple of proposal <br /> inquiries since the mailing. Ehlers and staff will review the proposals and report the results <br /> to the EDA at its March 14 regular meeting. <br /> Concept Plan, Costs and Improvement Schedule <br /> Staff has discussed commencing the improvement process for the EDA Brown property in <br /> March. Staff has had preliminary discussions regarding financing options based on the <br /> preliminary concept design and an estimate for improvements, both of which could change <br /> depending on proposal concepts. <br /> The City Engineer,Terry Maurer has evaluated the drainage of the area and has <br /> recommended that the existing pond,located below the southwest corner of Lot 1,be <br /> expanded to handle the drainage for the entire business park. Expanding the existing pond <br /> • would allow Lot 9 to be used for development rather than as a drainage area. <br /> In July of 2000 the Northstar Corridor Development Association (NCDA) commissioned a <br /> station area planning study to evaluate the long range transit-oriented development potential <br /> surrounding the proposed depot station sites. The study indicated a concept for commercial <br /> office/business development and some neighborhood retail surrounding the station for a 1/4 <br /> mile radius. Within a I/2 mile radius the study indicated office/business development to the <br /> north of the station and low density residential to the east. Another concept indicated low <br /> density residential for the majority of/4 mile and 1/2 mile radius,with the exception of a <br /> small neighborhood retail node adjacent to the station. <br /> The attached land use map was adopted as part of the city's Comprehensive Plan. The land <br /> use map indicates the following uses surrounding the depot station: <br /> • High-density residential <br /> • Light Industrial <br /> During the Comprehensive Planning process this area was viewed as an important location <br /> for both employment and higher density housing. The adopted plan keeps these land uses <br /> separate. A concept considered in the process created a new mixed-use land use category for <br /> this area. The planning process did not examine transit-oriented in detail,but considered <br /> transit as a factor influencing land use. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.