Laserfiche WebLink
Service Information <br /> Electric Service Service Size (Amps) Rewire? Yes No Proposed Added kW? <br /> (Circle One) <br /> ❑ Single Phase ❑ Three Phase ❑ Overhead ❑ Underground <br /> Voltage Requested? Electric Meter Location ❑ North ❑ South <br /> ❑ East ❑ West <br /> Water Service <br /> Water Access Units (as determined by Elk River City Building Department) <br /> Water Meter Location ❑ North ❑ South ❑ East ❑ West <br /> 1. Provide a sketch of desired meter location and distances from building corner. <br /> 2. Customer-owned facilities must be located and identified (i.e. sprinkler, septic,drain field, etc). <br /> 3. Final inspection affidavits must be provided prior to installation of any electric or water meter. <br /> 4. Site must be within 4 to 6 inches of final grade and a 10'wide path clear of obstructions to meter locations. <br /> 5. Winter construction charges may apply if frost exists, additional charges may be applicable for special requests. <br /> ERMU Office Use Only <br /> Estimated Peak Demand (kW) <br /> Estimated Monthly Energy (kWh) Estimated Monthly <br /> Electric Bill <br /> Estimated Monthly Water Use <br /> Estimated Monthly <br /> Water Access Charges Water Bill <br /> Sewer Access Charges <br /> Estimated Monthly <br /> Sewer <br /> Results of Credit Report <br /> Security Deposit Required 1 to 3 times average monthly bill for Electric, Water, Sewer. <br /> 93 <br />