My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.4 ERMU 01-12-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2016
>
01-12-2016
>
2.4 ERMU 01-12-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2016 12:05:27 PM
Creation date
2/2/2016 12:05:16 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
1/12/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELK RIVER MUNICIPAL UTILITIES <br /> Demand Electric Service <br /> Determination of Billing Demand: The billing demand shall be the highest measured <br /> demand (corrected for power factor if required) during any fifteen (15) minute period <br /> occurring in the current billing period. But in no month shall the billing demand be <br /> greater than the value in kW determined by dividing the kWh sales for the billing month <br /> by 75 hours per month. This billing adjustment applies only if the customer's peak <br /> demand DOES NOT occur between the hours of 3:00 p.m. and 10:00 p.m. <br /> Fluctuating Loads: Customers operating equipment having a highly fluctuating or large <br /> instantaneous demand, such as welders and X-ray machines, shall be required to pay all <br /> non-betterment costs of isolating the load from the balance of Elk River Municipal <br /> Utilities' system so that the load will not unduly interfere with service on Elk River <br /> Municipal Utilities' lines. In addition, Customers who fail to provide adequate corrective <br /> equipment shall be required to own and maintain their own transformers. No motor <br /> larger than ten (10) HP (or 7.355 kW) will be allowed to be across-the-line started <br /> without notification and written authorization from Elk River Municipal Utilities. <br /> Power Factor Adjustment: For loads of 50 kW or more, or at the option of Elk River <br /> Municipal Utilities for loads of less than 50 kW, power factor adjustments may be made <br /> in the billing demand, when the power factor, as determined by test, at the time of the <br /> Customer's maximum use is less than 95%. If the power factor, as measured by Elk <br /> River Municipal Utilities' electric department, is lower than 95%, the monthly demand <br /> charge may be multiplied by the ratio 95% divided by the measured power factor, or at <br /> Elk River Municipal Utilities option, the power factor may be corrected at the Customer's <br /> expense. <br /> Terms of Payment: Bills are due and payable upon receipt and are considered <br /> delinquent if not paid by the due date noted the bill. There will be a ten (10) percent late <br /> payment charge added to all accounts that are not paid by the due date. <br /> Terms and Conditions: <br /> 1. Usage may be fractionalized on the actual days of service for application of a <br /> change in rate. <br /> 2. Service will be furnished under Elk River Municipal Utilities rules. <br /> 3. Extensions made for service under this schedule are subject to the provisions of Elk <br /> River Municipal Utilities' rules governing Extension of Service and Facilities. <br /> 4. The rates set forth herein may be modified by the amount of any governmental <br /> changes imposed and levied on transmission, distribution, production, or the sale of <br /> electrical power. <br /> 5. Exceptions by management approval only. <br /> Approved Adopted December :“, 201 <br /> Effective January 1, 201c,=> <br /> 66 <br />
The URL can be used to link to this page
Your browser does not support the video tag.