My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.2. HRSR 12-03-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2000-2009
>
2001
>
12-03-2001
>
5.2. HRSR 12-03-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2016 3:41:51 PM
Creation date
1/28/2016 3:05:13 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
12/3/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br /> ikk <br /> River <br /> Redevelopment Concept Options <br /> Advantages/Disadvantages Worksheet <br /> Option A— Advantages Disadvantages <br /> * Maintains status quo * If no action is taken, change will be <br /> a continued decline <br /> Option B — Advantages Disadvantages <br /> * Improves traffic bottleneck at Main St. &Hwy 10 * Lose 12-15 surface parking spaces <br /> * Maintains existing structures * $$ for bridge <br /> * Creates full streetscape—Jackson Ave, strong gateway <br /> * Provides opportunity for community activity as a draw <br /> * Increases housing <br /> • * Hwy 10 gateway landscaped <br /> * Maintains connection to the river <br /> * Maintains existing retail/service business <br /> Option C — Advantages Disadvantages <br /> * Main St. on same trajectory *Lose Hwy 10 gateway landscaping <br /> * Hwy 10 lowered * Limited increase of housing <br /> * Dining and family center as draw *Lacks strong visual/physical access to river <br /> * Creates full streetscape—Jackson Ave, strong gateway <br /> Option D — Advantages Disadvantages <br /> * Revitalize core structures *Limited increase of housing <br /> * Infill development *Allows no left turn to Main St from CR42 <br /> *Adds retail/office * Doesn't develop strong gateway (Jackson) <br /> * Relieves congestion at CR42 &Main St * Lose Hwy 10 gateway landscaping <br /> * Better utilizes existing parking areas * Lacks strong draw to the downtown <br /> * Maintains connection to the river <br /> Option E — Advantages Disadvantages <br /> * Start with"clean-slate" for new development * $$ Costly <br /> * Disruptive <br /> *Lose existing traditional character <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.