My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 PCSR 01-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
01-26-2016
>
8.1 PCSR 01-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 12:36:18 PM
Creation date
1/22/2016 12:34:28 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/26/2016
case
CU 16-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bogart, Pederson <br /> &Associates, Inc. <br /> ' LAND SURVEYING <br /> IF% <br /> CIVIL ENGINEERING <br /> MAPPING <br /> January 18, 2016 <br /> Jesse Hartung <br /> President <br /> Modern Construction of Minnesota, Inc. <br /> 621 Main St. <br /> Elk River, MN 55330 <br /> Dear Mr. Hartung, <br /> This letter is in response to your inquiry about the stormwater management basin in the <br /> MISSISSIPPI RIDGE plat that is adjacent to Lot 4, Block 1, MISSISSIPPI RIDGE 2ND <br /> ADDITION. This basin was designed to accommodate the runoff from the MISSISSIPPI RIDGE <br /> development. The original two lots along Yale Court NW south of 171st Avenue NW were later <br /> split into the four lots of MISSISSIPPI RIDGE 2ND ADDITION. The original MISSISSIPPI <br /> RIDGE Drainage Summary dated 2/7/2001 indicated a 15 inch storm stub for Lot 2, Block 2 <br /> with plans indicating a 12 inch RCP stub. <br /> From my understanding of the Feasibility Report for Yale Street, Street and Utility <br /> Improvements,prepared for the City of Elk River, MN, dated July 28, 2014,the report indicates <br /> the need for a frontage road which extends southerly into Lot 4 from the Yale Court NW cul-de- <br /> sac. It appears the storm basin south of 170th Ave. NW would be partially filled to construct the <br /> proposed frontage road with a proposed storm sewer to convey overflow stormwater to the <br /> proposed expansion of the basin in the MISSISSIPPI RIDGE plat that is northwest of Lot 4. <br /> Though I have only the Feasibility report and thus no drainage calculations, the expansion of the <br /> basin northwest of the cul-de-sac is probably a direct result of the filling of the basin south of <br /> 170th Ave. NW. Possible avoidance of the subsequent expansion of the existing basin northwest <br /> of the cul-de-sac from the layout in the Feasibility report include the following: <br /> The basin south of 170th Ave.NW serves a large drainage area. Any storage basin <br /> proposed between 167th Ave. NW and 170th Ave. NW and between Yale St.NW and <br /> Highway 10 could mitigate the storage effects of the filling of the basin south of 170th <br /> Ave. NW. <br /> Infiltration basins or trenches could be proposed along the proposed frontage road <br /> corridor. This would be in line with current NPDES requirements. Examples would <br /> include the east side of the frontage road at about STA. 128+00 or west side of the <br /> frontage road at about STA. 111+25. <br /> Main Office:Becker Phone: 763/262-8822 <br /> 13076 First Street Toll free: 888/210-8301 <br /> Becker,MN 55308 Fax: 763/262-8844 <br />
The URL can be used to link to this page
Your browser does not support the video tag.