My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 PCSR 01-26-2016
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2016
>
01-26-2016
>
8.1 PCSR 01-26-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 12:36:18 PM
Creation date
1/22/2016 12:34:28 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/26/2016
case
CU 16-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> Ecology Project JAN 2 0 2016 <br /> 1/20/2015 <br /> Response to City comments <br /> Parking Concerns: <br /> I have updated the concept set to increase the underground parking to include 84 stalls on Level 1,93 <br /> on the level 2 (car wash to be removed), 10 spaces on the street, 22 spaces of surface parking for a total <br /> of 209 spaces. We also have the option of adding an additional 20 spaces above the surface parking if <br /> needed but want to use it as additional capacity if needed. I am requesting the plans move forward with <br /> the parking as is with a recommendation that the planning commission support a variance to the <br /> required amount of spaces. <br /> Property Lines: <br /> I have revised the site plan so bring the project within the property lines with the exception of the north <br /> end section by the surface parking. Upon completion of the work session I will begin discussions with <br /> the property owners to acquire that portion of land. <br /> Landscaping plans: <br /> Attached is a preliminary rough draft on the landscaping plans,we will be consulting with a number of <br /> firms after approval of the project to implement the permeable hard surface cover,the native prairie <br /> plantings,and the remainder of the grass and plantings. I am requesting the project be approved on the <br /> contingency that the final landscaping plan will be approved during the PUD <br /> Parking areas: <br /> The site plan has been updated to reflect the requirement for B612 Curb and gutter. <br /> Engineering: <br /> The Yale Ct extension project is part of the FAST plan for the redevelopment of the area. Ecology is not <br /> dependent on having the extension in place nor is the extension of Yale ct dependent on the Ecology <br /> project. As the projects are two separate independent projects it is assumed the city would install the <br /> Yale Ct extension at the time it decides to implement that portion of the FAST plan and assess the <br /> improvements on the appropriate landowners at the time of the extension. <br /> Ecology is designed to allow for 170th ave to connect to the yale st alignment,the current site plan for <br /> ecology does not infringe on any of the existing work proposed by the city under the FAST plan. <br /> Grades to the underground parking do not currently start until after the road right of way,the updated <br /> site plan shows the fire access road coming from the same access point as the underground parking. <br /> The site plan has been updated to bring the street parking on yale street to within the right of way. <br /> Discussions with the property owners to the north will begin once the planning commission work <br /> session is complete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.