My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.0. 6.0. 7.0. 8.0. HRSR 03-26-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2000-2009
>
2001
>
03-26-2001
>
5.0. 6.0. 7.0. 8.0. HRSR 03-26-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 9:34:32 AM
Creation date
1/20/2016 9:34:31 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
3/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> . Question: What happens if the pavers settle? Response: The sidewalk is within the <br /> public right-of-way. If the sidewalk settles the City will repair that portion of the sidewalk. <br /> The subgrade will be tested prior to placement of the pavers to try to eliminate that from <br /> happening. <br /> Question: Has the existing sidewalk held up as long as it should have? Response: The <br /> existing sidewalk did deteriorate before its expected life cycle. At this point in time the <br /> City would throw a lot of money at trying to assess blame between the supplier and the <br /> contractor. The City has decided that rather than trying to do that they would accept <br /> responsibility and repair the sidewalk. With ERMU burying the overhead power lines <br /> and with the construction of the new building at Main Street and King Street this is the <br /> opportune time to replace the sidewalk. <br /> Question: Will we be buying the pavers from the manufacturer and will this be an open <br /> bid situation? Response: No we will not. The manufacturer has informed us that they <br /> have an ample supply and the Contractor should have no problem placing an order of <br /> this size. <br /> Question: Will the sidewalk project be completed before Art Soup? Response: Every <br /> effort will be made to compete the project before Art Soup. If there are weather delays <br /> then the downtown area will be restored to the best of the Contractor's ability and <br /> construction will resume after Art Soup. <br /> Question: Will parking restrictions be kept to a minimum? Response: Every effort will <br /> • be made to keep the disruption to the downtown area to a minimum. Weekly <br /> construction meetings will be held to ensure proper coordination. <br /> With no further questions the meeting was closed. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.