My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.0. HRSR 02-26-2001
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
2000-2009
>
2001
>
02-26-2001
>
7.0. HRSR 02-26-2001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2016 9:01:01 AM
Creation date
1/20/2016 9:01:00 AM
Metadata
Fields
Template:
City Government
type
HRSR
date
2/26/2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02/22/01 THU 10:54 FAX 2411313 CREDITAMERICA SAVINGS CO . Z 002 <br /> i FOR �`'�i <br /> Rivers Edge Downtown Business As iociation Meeting <br /> Minutes from February 14, 2001 <br /> Our meeting began promptly at 7:30 am, withthe following members <br /> present: Cliff, Tony, Cindy, Anne, Becky, Marly;, Cathy M., Jeff, Wendy, <br /> Paul and Sara. Special guests were : Steve Rolf, 'Cony Darkenwald, and Sue <br /> Seeger. <br /> Treasurers Report: By Cindy Koonce. <br /> We currently have a total balance in our fund of S2,023.33 per Jim Simpson <br /> our Treasurer. Jim was not able to make the meet'lig today, but provided the <br /> current balance for this report. <br /> Secretary's Report: ByCindy Koonce <br /> We reviewed the minutes from our last meeting ai id found that two <br /> corrections were needed. Cathy M., of the EDA, stated that there were two <br /> errors on the last report, the first being that the tw a choices for new <br /> sidewalks were actually a cobblestone brick or Venetian Parquet. The <br /> second change was in the last sentence, were it wz s stated that the next EDA <br /> meeting was on January 22, when in fact this was an HRA meeting. <br /> Otherwise, all minutes were approved as typed. <br /> Old Business: <br /> Fishing Pier: By Becky Doebler <br /> Becky is attending the Park and Recreation meetir g today at 7:00 pm along <br /> with Paul D., from the DNR. It is expected that the Park and Rec. board will <br /> bless this new addition proposed to go into the downtown area. This will <br /> still need the City Council's support, along with tk e DNR. We already have <br /> the DNR on our side, and hope that the City Council will agree that this <br /> would be a great draw to the downtown area. Funding from the Rivers Edge <br /> group was requested, in the amount of S1,000.00 to r help fund the project. <br /> Motion was made by Becky D. and Seconded by Paul H. Motion passed and <br /> carried. <br /> Sidewalk improvements: By Cliff and Cathy <br /> HRA and City Council approved the solid pattern design that was proposed <br /> • to them. The pattern is a cobblestone paver style that the new Bank building <br /> is looking to put in on their sidewalks. The old side walks will be removed <br /> this year to make way for the underground electric that will be installed <br />
The URL can be used to link to this page
Your browser does not support the video tag.