Laserfiche WebLink
Stormwater <br />Stormwater management requirements are needed as listed in Ordinance Sec. 78-503. - <br />Stormwater and urban runoff control. and Sec. 78-504. - Post construction stormwater <br />management. NPDES permit is needed for construction activity disturbing one acre or <br />more of soil. Also, a MIDS water quality report and soil borings showing the ground water <br />depth is needed. Three feet of separation between the bottom of any proposed stormwater <br />basin and ground water is required. <br />Environmental <br />8. A wetland delineation will need to be completed prior to platting as the previous delineation <br />has expired. <br />9. All structure setbacks must be at least 45 -feet from a wetland. When the development is <br />platted a 45' easement shall be added around all delineated wetlands and stormwater ponds. <br />10. The area of wetland left to be mitigated (SE of PID 75-799-0040) must be completed prior <br />to the start of construction. <br />It is helpful to provide a written response letter to these comments, along with revised drawings. If <br />you have any questions I can be reached at 763.635.1035. If you wish to submit updated plans prior <br />to the City Council concept review on January 19, 2016, please submit them by January 14, 2016, at <br />4:30 p.m. <br />Sincerely, <br />Zack Carlton <br />Planning Manager <br />zcarlton@E1kRiverMN.gov <br />763.635.1035 <br />