Laserfiche WebLink
Project Wastewater Treatment Facility Improvements 2014 Owner City of Elk River Appltcation Number 14 <br />Contractor Rice Lake Construction Group Date of application 1/5/2016 <br />EngineerBolton & Monk, Inc. Work completed through 111=16 <br />Pay Item <br />Number <br />Item <br />Oescripbon <br />B <br />Scheduled Vatue <br />C <br />From Previous <br />Application (C+D) <br />D <br />This Period <br />E <br />Matenals Presently <br />Stored (not in Coi D) <br />Total Completed <br />and Stored to Date <br />(C + D + E) <br />1/6 <br />U <br />Balance to <br />Finish <br />155004 <br />Test & Batarce <br />$5,000,00 <br />$0.00 <br />$000 <br />0.00 <br />$5,000 00 <br />15950 <br />HVAC Controls <br />$67.40000 <br />$22,000,00 <br />$22,000.00 <br />3264 <br />$45,400.00 <br />16000 <br />Electrical <br />160001 <br />General Provisions <br />$55,00000 <br />$32,700.00 <br />$32,700.00 <br />59.45 <br />$22,300,00 <br />160002 <br />Basic Matervals and Methods <br />$265.00000 <br />$148,100.00 <br />$6,800.00 <br />$154,900.00 <br />5845 <br />$110,100.00 <br />16000.3 <br />Motors <br />$32,000.00 <br />$8,12000 <br />$4,40000 <br />$12,520.00 <br />39 13 <br />$19.480.00 <br />16000.4 <br />Power Generation System <br />$414,000.00 <br />$409,000-00 <br />$5,000.00 <br />$414,0()0-00 <br />100.00 <br />$0-00 <br />161700,5 <br />160006 <br />Electrical Distribution <br />Lighting <br />$385,000.00 <br />$85,000.00 <br />$363,550.00 <br />$37,00000 <br />$1.60000 <br />$363,550.00 <br />$38.60000 <br />9443 <br />45.41 <br />$21,450.00 <br />$46.400.00 <br />160007 <br />Special Systems <br />$24,000.00 <br />$3,080,00 <br />$1,100.00 <br />$4,180.00 <br />17.42 <br />$19,82000 <br />160008 <br />Starters and Motor Control <br />$330,00000 <br />$269,300.00 <br />$21,000 00 <br />$290,300.00 <br />87.97 <br />$39,700.00 <br />16000.9 <br />Instrumentation and Control <br />$480,000.00 <br />$345,200.00 <br />$6.800.00 <br />$352,000.00 <br />7333 <br />$128,000.00 <br />Change Order No. 1 <br />$259,991 59 <br />$259,991.59 <br />$259,991.59 <br />100 CO <br />$000 <br />$16,7&$,191.59 <br />$11,788,370.86 <br />$339,880,00 <br />$0.00 <br />$12,128,250.86 <br />72.26 <br />$4,856,940.73 <br />r_rrrne, ni., F Tin »nm <br />Prepared by the FnBineent' ,loin[ Contract Documents Committee and endorsed by the A_csociated General Contractors of America and the Construction Specifications Inoitule <br />Page 7 of 7 <br />