Laserfiche WebLink
Project, <br />wastewater Treatment Facility Improvements 2014 <br />Owner <br />City of Elk River <br />Application Number <br />14 <br />Date of application <br />111512016 <br />Contractor: <br />Rice Lake Construction Group <br />Work completed through: <br />111/2016 <br />Fngireer. <br />Bolton IL !Honk, Inc. <br />Item <br />t3 <br />C <br />D <br />E Total Completed <br />% <br />Balance to <br />Pay Item <br />Descriptionand <br />Scheduied Value <br />From Previous <br />This Period <br />Stored to Date <br />Materials Presently (C + D + E) <br />(F} <br />Finish <br />Number <br />Application (C+D) <br />Stored (not in Col D) <br />11356 <br />Screw Press <br />11356.1 <br />-Purchase <br />$575,000.00 <br />$546,250.00 <br />$546,250.00 <br />95.00 <br />$28,750.00 <br />11356,2 <br />-Install <br />$25,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$25,000.00 <br />11374 <br />Fine Pore Aeration Equipment <br />11374.1 <br />-Purchase <br />$100,000.00 <br />$95,000.00 <br />$5,000.00 <br />$100,000.00 <br />100.00 <br />11374.2 <br />-Install <br />$75,000-00 <br />$50,000-00 <br />$50.000.00 <br />66.67 <br />$25,DO0.00 <br />11375 <br />Blower System (PD w/Enclosure) <br />11375.1 <br />-Purchase <br />$180,000.00 <br />$95,000.00 <br />$95,000.00 <br />52.78 <br />$85,00004 <br />11375.2 <br />-Instatl <br />$30,000.00 <br />$15,000.00 <br />$15,000.00 <br />50.00 <br />$15,000.00 <br />11376 <br />Hybrid Blower System (AR. No. 2) <br />11376.1 <br />-Purchase <br />$270,000.00 <br />$256,500.00 <br />$13,500 OD <br />$270,000.00 <br />100 0D <br />$0,00 <br />11376.2 <br />-Install <br />$25,000.00 <br />$25,000-00 <br />$25,000.00 <br />10000 <br />$0.00 <br />11385 <br />Coarse Bubble Aerobic Digester Mixing System <br />11385.1 <br />-Purchase <br />$65,000-00 <br />$61.750.00 <br />$61,750,00 <br />95.00 <br />$3,250.00 <br />11385,2 <br />-Install <br />$40,000.00 <br />$25,000.00 <br />S25,00000 <br />62.50 <br />$15,000.00 <br />11386 <br />Rapid Mixers <br />11386.1 <br />-Purchase <br />$26,000.00 <br />$24,700.00 <br />$24,7 0.00 <br />95.00 <br />$1,300.00 <br />11386.2 <br />-Install <br />$3.50000 <br />$0-00 <br />$0.00 <br />$ <br />O.OD <br />$3,500.00 <br />11387 <br />Submersible Mixers <br />11387.1 <br />-Purchase <br />$75,000.00 <br />$71,250.00 <br />$71,250.00 <br />95 Q0 <br />$3,750.00 <br />11387.2 <br />-Install <br />$12,OOO.00 <br />$8,50000 <br />$8,500.00 <br />70.83 <br />$3.500.00 <br />11636 <br />Phosphorus Analyzer <br />11636.1 <br />-Purchase <br />$26,000.00 <br />S16,500001 <br />$16,500.00 <br />63.46 <br />$9,500.O0 <br />11636.2 <br />-Install <br />$5,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$5,000.00 <br />12346 <br />CaseworklLab Eq. <br />$45,000.00 <br />$0.00 <br />$C.00 <br />0-D0 <br />$45,000.00 <br />13126 <br />Circular Tank Covers <br />13126.1 <br />-Purchase <br />$292,837.00 <br />$000 <br />$0.00 <br />0,00 <br />$292,837.00 <br />13126.2 <br />-Install <br />$75,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$75,000.00 <br />14300 <br />Hoists 8 Cranes <br />14300.1 <br />-Purchase <br />$40,000.00 <br />$0.00 <br />$0.00 <br />0.00 <br />$40,000,00 <br />14300.2 <br />-Install <br />$12.00000 <br />$0.00 <br />$0.00 <br />0.00 <br />$12,000.00 <br />14500 <br />Material Handling Equipment <br />Page 5 of 7 <br />