My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3. EDSR 12-21-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Economic Development Authority
>
EDA Packets
>
2014-2020
>
2015
>
12-21-2015 WORKSHOP
>
3. EDSR 12-21-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 3:14:52 PM
Creation date
12/18/2015 2:31:27 PM
Metadata
Fields
Template:
City Government
type
EDSR
date
12/21/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Elk River Tax Abatement Policy & Application <br />Amended February 2014 <br />Page 15 of 15 <br /> <br /> The project will be 100% Pay-as-you-go Tax Abatement 3 points <br /> The project contributes to the goals of Energy City. 2 points <br />• Product promotes sensible use of energy, OR <br />• Project utilizes significant energy efficient design &/or <br /> materials in construction. <br /> <br /> <br />Total Points: <br />Overall project desirability: High 45-38 points <br />Moderate 37-29 points <br />Low 28-20 points <br />Not Eligible 19-0 points <br />
The URL can be used to link to this page
Your browser does not support the video tag.