My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. PCSR 12-22-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2015
>
12-22-2015
>
4.1. PCSR 12-22-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2015 1:52:13 PM
Creation date
12/18/2015 1:51:42 PM
Metadata
Fields
Template:
City Government
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
architects <br />engineers <br />www.woldae.com <br />305 St. Peter Street <br />St. Paul, MN 55102 <br />October 26, 2015 <br />Zack Carlton <br />Elk River Planning Commission <br />13065 Orono Parkway <br />Elk River, Minnesota 55330 <br />tel 651.227.7773 Re: Independent School District #728 Elk River Area Schools <br />fax 651.223.5646 Elk River High School Additions and Renovations Narrative <br />mail@woldae.com Commission No. 142178 <br />Dear Zack, <br />Independent School District #728 is submitting the following project narrative in compliance with the Site Plan Review <br />application requirements for the Elk River High School Additions and Renovations project. <br />Scope of Work: The above mentioned project includes a two (2) station gymnasium addition plus weight room addition <br />to be built to the north of the existing building and to the east of the existing detached ice arena. Primary exterior <br />building materials will consist of precast concrete wall panel, exterior brick veneer, integrated translucent wall panel <br />clerestories on the east and west elevations and exterior aluminum storefronts at the main entrances and exits. This <br />facility will address physical education, academic and athletic needs district wide. <br />Additionally, the scope of work includes major renovations to portions of the existing interior building. The primary <br />purpose of the renovation is to relocate the existing main office suite to the front of the building near the main entrance. <br />The current main office is near the center of the building and does not provide a level of security or functionality <br />consistent with District standard practices. The main office relocation will displace two (2) business education <br />classrooms, one (1) marketing classroom and the school store. These spaces will be relocated to the current main office <br />location. The existing special education department will also be reconfigured to better facilitate District special education <br />teaching practices. <br />All associated site reconfiguration due to building additions are included in the drawings portion of the Site Plan Review <br />submittal. Thank you for your consideration! <br />Sincerely, <br />WOLD ARCHTIECTS AND ENGINEERS <br />Sean Kelly <br />cc: Mark Bezek, ISD #728 <br />Terry Bizal, ISD #728 <br />Tom Baranick, ISD #728 <br />Vaughn Dierks, Wold <br />Robert Sehm, Wold <br />Minnesota <br />Illinois <br />Michigan <br />Colorado <br />Iowa <br />designers and researchers for public environments <br />
The URL can be used to link to this page
Your browser does not support the video tag.