Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Background: <br />Born and raised in Massachusetts, Charlie became a professional skateboarder in 1996 and helped pioneer the <br />Boston skateboarding scene. While he gained fame with magazine photo spreads and video parts, his passion <br />for Mass skateboarding transcended way beyond flip tricks and grinds – he spent considerable effort <br />organizing events, participating in the design and construction of municipal skatepark projects and he was a <br />regular instructor at the Rye Airfield indoor skateboarding camp. <br />After making the transition to the West Coast in 2011, Charlie connected with Spohn Ranch through our event <br />work for the Mountain Dew Tour. He had honed his AutoCAD skills as Alli Sports & NBC’s lead designer since <br />the Dew Tour’s inception in 2005 – a role in which he designed dozens of world-class event courses for our <br />industry’s premiere athletes. Charlie’s CAD expertise and ability to work with tight spaces and timelines made <br />him a perfect fit for Spohn Ranch and he’s since enjoyed a seamless transition into our design department. <br />In addition to a full-time position as one of Spohn Ranch’s lead designers (Damon Spohn, Aaron’s brother is the <br />other), Charlie continues a 15+ year career as a highly-respected professional skateboarder. Charlie also <br />maintains a well-rounded perspective as head judge for World Cup Skateboarding – one of our industry’s <br />sanctioning bodies for professional competitions. <br />Project Role: <br /> <br />For the Orono Park project, Charlie will be Spohn Ranch’s lead designer and draftsman. He’ll work closely with <br />Aaron and Vince during design development as the footprint, elevations and terrain sections begin taking <br />shape. He’ll then collaborate with Matt Miller and our A/E team during the construction documents phase. <br />While the initial planning work may consist of simply pencil and paper, Charlie will eventually tap into years of <br />CAD experience to create a detailed 3D model. He is known around our office as the man who can tackle the <br />most complex modeling challenge – such as waterfalls, blend walls and organic sculptures. <br />Highlighted Project List: (while with Spohn Ranch) <br />Radtke Park Skatepark – West Allis, Wisconsin OB Nelson Park Skatepark – Fairfield, Iowa <br />North Adams Skatepark – North Adams, Mass Long Beach Skatepark – Long Beach, New York <br />Walker Mill Skatepark – District Heights, Maryland Summit Bechtel Reserve – Glen Jean, West Virginia <br />SKATEPARK DESIGN <br />PROJECT ROLE: Skatepark Designer & Draftsman <br />EXPERIENCE: 15+ years as a professional skateboarder, <br />10+ years in skatepark design and construction <br />SPONSORS: Lifeblood Skateboards, DVS Shoes, Matix Clothing, <br />Ace Trucks and Bones Wheels. <br />CHARLIE WILKINS