Laserfiche WebLink
<br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Task 2.1 Design Workshop #2 – Spohn <br />Ranch will return to Elk River to present <br />the alternate schematic designs and solicit <br />feedback. The presentation will begin <br />with a video fly-through that navigates <br />through the designs and highlights the <br />various features. Spohn Ranch will narrate <br />the video explaining the terrain and what <br />factors influenced the designs. <br />The designs will also be showcased on 24” <br />x 36” poster boards with high-end 3D <br />renderings and labeled/dimensioned <br />drawings. Prior to the public workshop, <br />the Spohn Ranch design team will attend a <br />closed meeting with City staff to discuss the designs and present a detailed construction cost estimate. <br />The second workshop will follow a more organic, free-flowing format, with Spohn Ranch leading a discussion <br />about the schematic designs and seeking input from the skateboarding community. 2D line drawings of the <br />designs will be available for participants to sketch out suggested revisions. <br />The alternate schematic designs will also be posted to the Facebook group following the meeting for review by <br />stakeholders unable to attend the workshop. <br />Task 2.2 Workshop #2 Report – Spohn Ranch will review feedback from the second workshop with the rest of <br />the design team. The team will discuss opportunities for incorporating the community’s input and identify the <br />next steps for finalizing design development while staying on budget and on schedule. The discussion will be <br />summarized in a report to be submitted to the City. <br />PHASE-2 DESIGN DEVELOPMENT <br />