Laserfiche WebLink
<br /> <br /> <br /> <br /> PHASE-1 – SCHEMATIC DESIGN <br />TASK COST <br />DESIGN WORKSHOP $1,500.00 <br />CAD DRAFTING FOR SCHEMATIC DESIGN $2,000.00 <br />RENDERING FOR SCHEMATIC DESIGN $500.00 <br />COST ESTIMATING $500.00 <br />PROJECT MANAGEMENT & COORDINATION $500.00 <br />TOTAL COST $5,000.00 <br /> <br />PHASE-2 – DESIGN DEVELOPMENT <br />TASK COST <br />DESIGN WORKSHOP $1,500.00 <br />CAD DRAFTING FOR DESIGN DEVELOPMENT $2,000.00 <br />RENDERING FOR DESIGN DEVELOPMENT $500.00 <br />COST ESTIMATING $500.00 <br />PROJECT MANAGEMENT & COORDINATION $500.00 <br />TOTAL COST $5,000.00 <br /> <br />PHASE-3 – CONSTRUCTION DOCUMENTS <br />TASK COST <br />CAD DRAFTING FOR CONSTRUCTION DOCUMENTS $3,500.00 <br />TECHNICAL SPECIFICATIONS $500.00 <br />MINIMAL IMPACT DESIGN STANDARDS (MIDS) REPORT $500.00 <br />STAMP & SIGN DRAWINGS $1,000.00 <br />COST ESTIMATING $500.00 <br />PROJECT MANAGEMENT & COORDINATION $500.00 <br />TOTAL COST $6,500.00 <br /> <br />ADD ALTERNATES <br />TASK COST <br />SOIL BORINGS & GEOTECHNICAL REPORT $3,500.00 <br />SITE SURVEY & AUTOCAD BASE $3,500.00 <br /> <br /> <br />CONSULTANT COST <br />& HOURLY RATES