Laserfiche WebLink
building permit fee plus state surcharge. <br />Plan check is included with this price <br />PARK DEDICATION FEE <br />Residential 3,712/dwelling unit <br />Commercial 7,444/acre <br />Industrial 2,485/acre <br />PLANNED UNIT DEVELOPMENT (PUD) Charge for required planning applications, <br />i.e. conditional use permit, rezoning, etc. <br />PLATS, PRELIMINARY APPLICATION 275 <br />Escrow for Consulting/Engineering/Staff Services 1,500 <br />PLATS, FINAL APPLICATION 275 <br />Escrow for Consulting/Engineering/Staff Services 1,000 <br />PLUMBING PERMIT Fee shall be the greater of$45 plus state <br />surcharge or 1.5% of the valuation of the <br />work material and labor <br />POOL <br />Above Ground 45 plus state surcharge <br />In Ground 75 plus state surcharge <br />RE-ROOF <br />Residential 75 plus state surcharge <br />Commercial/Industrial 2 per square foot for valuation for permit <br />fee plus state surcharge, minimum $75 <br />RENTAL DWELLING Fees listed under Fire section <br />RESIDENTIAL FIXTURE/APPLIANCE REPAIR OR REPLACE 15 minimum or 5% of the cost, <br />whichever is greater <br />RE-SIDING (Residential) 75 plus state surcharge <br />SANITARY SEWER USER FEE April 1, 2015 April 1, 2016 <br />Charge Per 1,000 Gallons 4.20 4.33 <br />Minimum Charge 9.76 10.05 <br />Apartment Unit Charge 16.79 17.29 <br />House Unit Flat Charge 22.06 S 22.72 <br />SEPTIC INSTALLATION & REPAIR PERMIT 130 <br />SEWER AVAILABILITY CHARGE (SAC) 4C^per unit S4J50 <br />SEWER&WATER HOOKUP/REPAIR PERMIT 150 commercial plus $2,000 bond in <br />Storm or Sanitary favor of the city <br />65 residential plus $2,000 bond in favor <br />of the citv <br />6