My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SWCSR 02-03-2010
ElkRiver
>
City Government
>
Boards and Commissions
>
Sherburne Wright Cable Commission
>
SWC Packets
>
2010
>
02-03-2010
>
SWCSR 02-03-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 11:24:38 AM
Creation date
12/10/2015 11:24:38 AM
Metadata
Fields
Template:
City Government
type
SWCSR
date
2/3/2010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4111 lower our costs. Some devices do not expect to have Windows 7 updates for awhile and <br /> will continue to run on XP. <br /> Many of these computers are custom built and need special drivers and interfaces to work <br /> with our equipment. The Smart Board computers for example still use serial ports which <br /> are not usually installed on newer computers anymore. In Elk River we recently had to <br /> replace a faulty computer and we were able to build a computer that supported the Smart <br /> Board system drivers and also run Windows 7. <br /> Here are some other highlights from this past quarter. <br /> Production Trailer <br /> The production trailer is currently being built. We have been told to expect delivery in 6 <br /> weeks. We are getting together the necessary equipment and parts. I am estimating that it <br /> will take us 2-3 weeks of work to.get everything installed. If everything goes according to <br /> plan we plan on having it at our next commission meeting for a tour. <br /> Mark and I are making plans to have it at all city festivals. We plan to offer tours and <br /> create videos that will run on a screen mounted outside the trailer that highlight the <br /> Sherburne Wright Cable Commission programming. It will of course be used to tape all <br /> city parades and other festival,events. If you work with your city festival committees <br /> please let them know that we will be contacting them to organize this display. <br /> 11111 Teleprompter Systems <br /> A new teleprompter system was recently installed in Elk River. We are finishing the <br /> install in Delano in February. <br /> Edit Systems <br /> We are currently installing a new edit system in Elk River. This system was approved last <br /> summer but the parts were not available until recently. This system is different from <br /> others in that it will edit in both Standard definition and High definition. <br /> Updates to edit systems in Dassel and Monticello were also done recently. <br /> Monticello FiberNet <br /> We have been contacted by Monticello's new FiberNet service and have been asked to <br /> provide a signal from city hall for them so that they can start fibercasting Monticello's <br /> channel. <br /> We have similar setups in Maple Lake and Big Lake where we have more than one <br /> company. In these cities we have setup a distribution amp so that each company can get <br /> the same signal we are providing to everyone. I am setting this same system up in <br /> Monticello. It will have a composite BNC out and mono audio out. The connections are <br /> setup so that when a company makes adjustments to their equipment it doesn't affect the <br /> other companies gear. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.