My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.0. ERMUSR 12-08-2015
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2015
>
12-08-2015
>
6.0. ERMUSR 12-08-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 12:12:59 PM
Creation date
12/8/2015 12:12:54 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
12/8/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> Elk River Municipal Utilities Commission Eric Volk-Water Superintendent <br /> John Dietz—Chair <br /> Al Nadeau—Vice Chair <br /> Daryl Thompson—Trustee <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> December 8, 2015 6.1e <br /> SUBJECT: <br /> Staff Update <br /> DISCUSSION: <br /> • Delivered three new residential water meters. <br /> • Sealed the water meter, and took curb stop ties from four water services. <br /> • Went on four service calls. <br /> • Completed 25 BACTUTotal Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> • Completed 20 routine fluoride samples and one mandatory validation sample for the <br /> Minnesota Department of Health <br /> o All samples met MDH standards. <br /> • The water department worked with the streets department to repair a leak on the Elk <br /> River Chamber of Commerce property. On the third attempt to locate the leak, an <br /> abandoned service line was discovered to be leaking. In the end,roughly$10,000 was <br /> saved by working together to solve the problem. <br /> • Well#5 is finally up and running. Although it was a warranty repair, we did incur some <br /> costs; we were required to do some controlupdates to meet the new warranty standards, <br /> the labor for EH Renner, and any additional materials required to reinstall the pump. <br /> • The mixer was installed for Gary Street Water Tower. The mixer will help us maintain a <br /> higher quality of water in the tank and will also help reduce the amount of ice that builds <br /> up, which will in turn prevent ice damage to the paint. New OSHA compliant fall <br /> protection was installed in the tower as part of the interior reconditioning. In addition, <br /> Jeff Smith from the fire department brought a tender to help us wash out the inside of the <br /> tank. <br /> ATTACHMENTS: <br /> • November Pumping by Well <br /> • November 2015 Accumulated Precipitation Graph <br /> • November 2015 Daily Temperature Graph <br /> R1Hift i <br /> 3`! Pagelofl POWERED BY <br /> NATURE <br /> Reliable Public <br /> Power Provider P O W E R E D To S E 0.V E <br /> 99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.