My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.8. SR 12-07-2015
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2015
>
12-07-2015
>
8.8. SR 12-07-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2015 9:12:37 AM
Creation date
12/3/2015 3:11:34 PM
Metadata
Fields
Template:
City Government
type
SR
date
12/7/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Plans and Specifications <br />Farm Outbuilding Removal Page 2 of 13 <br />- - - - - - - - - - - - - - - - - - - - - - - - - - <br /> <br />September 14, 2015 <br /> <br />General Specifications: <br />A. The Contractor shall dismantle and remove all debris from each structure identified by the City. <br /> <br />B. The Contractor is responsible for all permits and compliance with all local, state, and federal <br />building, electrical, safety, waste management, and other codes. A Demolition Permit with the City <br />of Elk River is required, at minimum. <br /> <br />C. The Contractor shall furnish all supervision, labor, materials, and equipment necessary to <br />accomplish The Work. <br /> <br />D. Services are to include removal and proper disposal of the selected outbuildings. If other <br />conditions are present that are not in the scope of this Agreement, the Contractor will notify the <br />City within 24 hours and will send bid and photos to request additional consideration. This <br />includes any hazardous waste located on site. <br /> <br />E. The Contractor is responsible for the repair of any damage to the Property caused by the <br />Contractor. <br /> <br />F. The Work shall be completed by July 31, 2016. <br /> <br />G. The Contractor shall maintain insurance(s) that meets or exceeds the City of Elk River Insurance <br />Requirements. The Contractor shall provide evidence of coverage to the City at the start of any <br />contract award and will advise the City of any changes of coverage; failure to do so may be <br />grounds for revocation of the Agreement. <br /> <br />H. The Contractor’s hours of operation shall be 7:00 a.m. to 7:00 p.m. (local time) on weekdays. This <br />includes starting and operation of machinery; delivery of equipment, materials, and machinery to <br />the Property; construction activity and any other activity which, in the opinion of the City, may be <br />disruptive to the surrounding community. The operational hours may only be extended following a <br />written request and the subsequent approval of the City. <br /> <br />I. Protection and repair of existing facilities and utilities: The Contractor shall perform operations <br />carefully and in such a manner as to protect any existing structures, underground facilities, and <br />utilities that are not part of the contract for removal. The Contractor shall be responsible for <br />damage to existing structures, underground facilities, and utilities resulting from The Contractor’s <br />operations, and shall repair or replace damaged items to the City’s satisfaction. <br /> <br />J. Any required access roads shall be included in the contract price. No additional compensation will <br />be provided. <br /> <br />K. All waste material shall be handled in accordance with MPCA and OSHA requirements. This <br />includes, but is not limited to, the use of appropriate DOT, OSHA, and EPA drums and <br />containers, use of appropriate fluid transfer devices, use of suitable absorbent materials, proper <br />transportation, etc. <br /> <br />L. All junk and debris shall be properly disposed of off of the Property location. Hazardous Waste <br />and materials prohibited to be landfilled shall be identified, noted, and properly disposed of,
The URL can be used to link to this page
Your browser does not support the video tag.