My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.0. 5.0. HRSR 06-29-1998
ElkRiver
>
City Government
>
Boards and Commissions
>
Housing & Redevelopment Authority
>
HRA Packets
>
1993-1999
>
1998
>
06-29-1998 SPECIAL
>
4.0. 5.0. HRSR 06-29-1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2015 4:00:39 PM
Creation date
12/2/2015 4:00:37 PM
Metadata
Fields
Template:
City Government
type
HRSR
date
6/29/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• , <br /> • <br /> Midwest Building Components, Inc. DO E <br /> Art \di- — <br /> 11.1 7210- 163rd Avenue NW, Ramsey, MN 55303 • Phone: (612) 576-3926• Fax: (612)422-9172 <br /> • <br /> Main& King Professional Building <br /> The proposed building will be a two story"L" shaped building with a full basement and <br /> will be esthetically historic in nature. <br /> The proposed building would be approximately 7,680 square feet per floor. It would be <br /> situated on the south east corner of the lot. The building would be set back from the <br /> sidewalks of King and Main with green space and have the main entrance at the corner of <br /> Main & King, a second entrance to the building will be at the back of the building at the <br /> intersection of the"L"portion of the building. A developmental target of 1 parking space <br /> • ( on and off site)for each 300 square foot of specific use gross floor area is used. The <br /> building will have two stairways and one elevator. <br /> Exterior of building <br /> • <br /> The style of the building would be historic in character and be earth tone in color. The <br /> exterior of the building will be architectural precast Double I panels using a combination of <br /> standard finishes. EFIS will be used to highlight the Cornice, Frieze & Architrave's at the <br /> top of the building and at various door and window locations. <br /> Basement area <br /> The building will have a full basement for mechanical, electrical, elevator and tenant <br /> storage. <br /> • <br /> 410 <br />
The URL can be used to link to this page
Your browser does not support the video tag.