Laserfiche WebLink
Planning Commission Minutes Page 2 <br /> October 27,2015 <br /> Jane Tokar, Business Manager for River of Life Church, explained that they will be removing <br /> the existing larger temporary office structure on the south side and adding a smaller <br /> temporary classroom structure adjacent to the existing temporary classrooms. She explained <br /> that the church planned to add onto the building in 2006,but due to changes in the <br /> congregation numbers and the economy, they were not able financially to do so. She asked <br /> that if the church had physical plans for a building addition in 2017,would the city be willing <br /> to extend the temporary classroom use until the building addition was complete. <br /> Chair Johnson asked what the current end date is for the structures. Mr. Leeseberg stated <br /> that it is June 1,217 for all three existing temporary structures. He stated that staff is not <br /> comfortable extending the date,and they would need concrete plans that a project will start. <br /> Commissioner Konietzko stated that he felt it would be reasonable to allow additional time, <br /> if there was a building plan pending. He stated he was not sure what would be needed as <br /> evidence. <br /> Discussion followed regarding appropriate language to be tied to a possible extension. <br /> Motion by Commissioner Larson-Vito and seconded by Commissioner Christianson <br /> to recommend approval of the request by River of Life Church for an Interim Use <br /> Permit for temporary classrooms at 21695 Elk Lake Road NW,with the following <br /> conditions: <br /> 1. The temporary structure on the south side of the building shall be removed <br /> before the proposed structure can be placed on the property. <br /> 2. The Interim Use Permit for all temporary structures shall expire on June 1,2017 if <br /> construction of the addition has not begun by June 1,2017. <br /> 3. A final Interim Use Permit extension may be allowed as long as construction of <br /> the addition has begun by June 1,2017. The final Interim Use Permit extension <br /> shall expire when construction is complete or by September 1,2017,whichever is <br /> sooner. <br /> 4. No further Interim Use Permits for temporary structures shall be allowed on the <br /> subject site after September 1,2017 <br /> Motion carried 6-0. <br /> 4.2 Request by Elk River Lodge & Residential Suites/The Briggs Companies for: <br /> - Land Use Amendment to change the land use of property at 17432 Zane <br /> St NW from FAST to Highway Business, Case No. LU 15-07 <br /> - Conditional Use Permit to allow hotel use, Case No. CU 15-17 — Public <br /> Hearing <br /> Zack Carlton stated that the applicant formally withdrew these applications yesterday <br /> (October 26, 2015), and stated that no action was required. <br /> 5. General Business - None <br />