Laserfiche WebLink
3v bpi; <br /> ft__ 111-11111 <br /> ,rr <br /> 1 <br /> _ k <br /> i <br /> 14 <br /> tl i I <br /> e <br /> 1.Green energy.Four Cummins Power t;ener at on engine gen IA on the b;ogas to generate electricity for the IOC"ll distribution systein Courtesy Ajuot Energy Inc. <br /> Heat recovery is another important part of the process.Cooling water from the engine water jackets is the main source of reclaimed energy.The heated <br /> water is fed into an insulated storage tank and then used in the gas cleaner,feeding module,electric generation, and in-floor heating systems. <br /> HTBE also recovers energy from the engine exhaust,which is used by the post-digestion system. By utilizing the heat recovery system, HTBE believes it <br /> extracts every ounce of value possible from its process.The heat is supplied to the plant's belt dryer,thereby reducing the moisture content of the solid by- <br /> product.This makes it more valuable as a renewable solid fuel for combustion offsite in biomass and coal-fired burners. It is also safe to reuse the <br /> separated solids as a bedding material for livestock in place of more expensive sawdust and wood shavings. <br /> Although the plant's 8-MW capacity may seem small compared to the average utility power plant, it is one of the largest facilities of its kind.The plant is <br /> permitted to process up to 45,000 dry tons of waste per year. <br /> A Community Asset <br /> Developing a power plant of any type comes with challenges. For HTBE, the technology is not particularly familiar to most people in the U.S., so its first <br /> challenge was educating the community about the project. <br /> Avant wanted local residents to understand that a facility of this kind is a long-term asset. HTBE provides important benefits to the local community by <br /> collecting and processing local wastes, and creating a renewable source of electricity that flows directly into the host community's power system. The <br /> company shared project information with the public early on in the development phase. It hosted meetings with community leaders,held open houses for <br /> local residents,and offered regular construction updates. <br /> In addition,Avant placed an emphasis on hiring locally.Although the plant only has seven permanent employees, local contractors, businesses,farmers, <br /> and other area residents all contributed to construction and startup in various ways,and continue to support operational activities.The plant also uses <br /> some seasonal employees. <br /> A Rapid Timeline <br /> Minnesota winters offer a multitude of challenges,especially for construction companies. Nonetheless,the project broke ground in December 2012 with a <br /> one-year goal for completion. <br /> "The aggressive construction schedule for the plant was a significant challenge, but we worked weekends and long hours.We also had good management <br /> 161 <br />