Laserfiche WebLink
Capital Improvement Plan 2016 Mru 2020 <br /> Department Fire Stations <br /> City of Elk River, Minnesota Contact Fire Chief <br /> Type Maintenance <br /> Project# F$-01 Useful Life 25 years <br /> Project Name Fire Station#1 <br /> Category Building Maintenance <br /> Priority nla <br /> Description <br /> 2016-Master planning study on fire facilities and replacement of the backup generator. <br /> Justification <br /> Fire Station#1 was constructed in 1972 and based on age and condition requires repair and replacement costs. <br /> The purpose of the study is to lay the foundation for Fire Station facilities,specifically fire station#1 which was built in 1972,The study will <br /> provide short and long range planning options to explore facility construction options for existing and possibly future fire station locations. <br /> The generator is old federal surplus that is in need of replacement. It does not have an automatic transfer switch requiring the firefighters or staff to <br /> manually convert the station over to generator by hand. Parts are becoming obsolete to snake repairs. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Planning/Design 40,000 40,000 <br /> Equipment 40,000 40,000 <br /> Total 80,000 80,000 <br /> Funding;Sources 2016 2017 2018 2019 2020 Total <br /> Government Buildings Reserve 80,000 80,000 <br /> Total 80,000 80,000 <br /> 2016-2020 DRAFT CAPITAL IMPRQYEMENT PLAN <br />