Laserfiche WebLink
10.Rivers Edge Commons Park Improvements $20,000 <br /> Complete maintenance needs at Rivers Edge Commons Park during the same time period as the park <br /> expansion project,including new pavers, trellis painting, and replacement LED lighting. <br /> 11.Woodland Trails Master Plan/Forest Mgmt. $23,000 <br /> The application to the Greater Minnesota Regional Parks and Trails Commission for regional park <br /> designation requires a master plan by early 2016 for the Park to be eligible. The master plan is estimated <br /> to range from$15,000 -$20,000. Staff recommends adding forest management plan to the master plan. <br /> 12.Wayfinding Signage $25,000 <br /> Replacement of the signage at Hillside Park when the new trail connection to the park is constructed in <br /> 2016. The Commission did discuss wayfinding and recommended at the October meeting that the funds <br /> be available park system wide and not for one specific park location. <br /> 13.Playground Hoop Replacement $9,000 <br /> Basketball hoops in three parks need replacement—Ridgewood, West Oaks,and Deerfield Hill Park. The <br /> playground and court space timbers at Deerfield also need replacement. <br /> 14. Trott Brook Tennis Court Resurfacing $14,000 <br /> Needed to alleviate the subsurface problem that is causing the courts to continue cracking and deteriorate. <br /> It will also install a new tennis court surface with lines. <br />